Monday, January 27, 2014

Ch-ch-changes!

I know it has been awhile since I've posted. So Sorry! My dad and older brother made a trip down with their trailer in tow and helped us move. We've been officially in the house for just over a week now. Still stepping over boxes and pushing things out of our way occasionally though. 

We're in that stage of unpacking where all (ok, most) of the necessities have been taken care of and it's just the things that are left. This house is so much larger than what I'm used to living in, and I have a decent amount of space to work with here. It is a little daunting trying to figure out the "right" place to put everything. 

Also, Nick and I have both been trying to be better about getting rid of excess stuff. Tossing it. Donating it. Whatever. I just want it out of the house. No extra clutter for this girl! I type that as I am sitting in a living room that is littered with STUFF. It is definitely a process, and a long one.

Since we have moved in we have been busy, busy, busy! Lots of little (and not so little) projects have been started. We have finally found a home services company (Shout out to Green Leaf Home Services!) that is helping us out with some of the things on our long list that need to be completed before we can reschedule our city inspection. (5 months and counting, people!) Nick has stepped up his DIY-game and is even familiarizing himself with the Home Depot that is only a few minutes away. (thanks free handy-dandy Home Depot App!)

I would like to dedicate a post to each of the changes that we've been making. Sadly, I am a terrible blogger and have spaced on taking that many pictures. Actually, it is less that I forgot to take them and more it is hard to stop a project to snap decent pictures when you only have a short time between dinner time and bath time with a toddler. So please forgive me! I will get around to posting actual pictures of the projects that we have gotten into so far, but for now I'll share list so you can see how much progress has already been made!

Living Room:

  • Tear up carpeting
  • Chip off and spackle peeling paint 
  • Hang Curtains
  • Paint walls
  • Paint trim
  • Build tripod lamp

Dining Room:

  • Tear up carpeting
  • Remove asbestos tiles
  • Paint walls
  • Paint trim
  • Build dinner table
Office:
  • Tear up carpeting
  • Paint wood paneling
  • Paint built ins
  • Build a new work desk
Breakfast Nook:
  • Remove wallpaper
  • Spackle uneven surfaces
  • Paint walls
  • Replace blinds/hang curtains
Kitchen:
  • Remove drop ceiling
  • Get new oven installed
  • Install light fixture/remove fluorescent light
  • Replace faucet
  • Repair garbage disposal
  • Replace water cut off valves under sink
  • Paint walls
  • Paint ceiling
Wow. And that is only the list for the Entry Level not including any of the bathrooms or bedrooms! Also, it doesn't include any of the decorative things such as, "buy a new sectional" or "build a coffee table"! We also need to paint the hallway that connects all of those rooms and goes upstairs. Eventually we want to refinish all of the wood floors throughout, but I know that it is going to be quite a while before we can fit that into our budget so for now, it gets left off of the list.

Nick and I are going to sit down one of these nights and make an in depth list of what we want to get done and set little goals so that we don't get too far "off track". Here's hoping that we can tackle the Living Room trim sometime this week!  


XO!
Sam

No comments:

Post a Comment